-- card: 51900 from stack: in -- bmap block id: 0 -- flags: 0000 -- background id: 64774 -- name: Setting the Interval of Time -- part 18 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=11 top=162 right=177 bottom=233 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 256 -- line height: 13 -- part name: subhead -- part 19 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=11 top=57 right=137 bottom=233 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: textField1 -- part 21 (button) -- low flags: 00 -- high flags: A003 -- rect: left=30 top=216 right=236 bottom=213 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: Timeline Scale Dialog Box ----- HyperTalk script ----- on mouseUp go card id 91869 end mouseUp -- part contents for background part 27 ----- text ----- 1. -- part contents for background part 6 ----- text ----- Choose Timeline Scale from the Layout menu. -- part contents for background part 28 ----- text ----- 2. 3. 4. -- part contents for background part 7 ----- text ----- Click the button for the interval you want to use. To show months, you must select either 4 Weeks or Calendar Month. If you want to change the start date for the interval, click the date in the “Grid line at” field and use the arrows that appear to display a new date. Click OK. -- part contents for background part 31 ----- text ----- Customizing the Charts -- part contents for background part 32 ----- text ----- Setting the Interval of Time -- part contents for card part 18 ----- text ----- To set the interval of time: -- part contents for card part 19 ----- text ----- The timeline interval affects the size and readability of the Task Timeline, Resource Timeline, Cash Flow Table, and Resource Histogram. The interval is preset to weeks, but you can change it and specify a starting date from which it will be calculated.